Technology
The coupling
A conventional centrifugal pump has one unavoidable problem: the impeller is in the fluid and the motor is not, so something has to cross the boundary between them. That something is a shaft, and where the shaft passes through the housing there has to be a seal that rides against it. Mechanical seals, lip seals, and packing all work on the same principle, which is a sacrificial contact surface holding pressure against a moving part.
It works, and it wears. Face wear, thermal cycling, dry-run damage, and particulate in the coolant all attack the same component, and when it goes the loop is contaminated or losing fluid. In a data center that means a service event inside a live rack.
Aviemore removes the shaft. The wet end is a closed vessel with no penetration. Inside it, the impeller carries a magnet assembly. Outside it, a driven rotor carries the matching assembly, and the motor turns that. Torque transmits through the containment barrier magnetically. Nothing mechanical crosses the boundary, so there is no dynamic seal to specify, no wear item in the fluid path, and no leak path.

What the coupling costs
Magnetic coupling is not free, and a vendor who tells you their approach has no tradeoffs is selling rather than engineering. Ours are known and bounded, and the envelope of the range is set by them.
- Torque ceiling
- A magnetic coupling will transmit only so much torque before the rotors decouple. This is why the range tops out at 5.0 kW. It is a hard limit, not a conservative rating.
- Loss through the barrier
- Driving through a containment barrier costs efficiency. Barrier material and wall thickness are selected to keep that loss inside the budget a CDU designer is working to, but the loss exists and we will quantify it for your operating point.
- Decoupling under fault
- An overload decouples. It does not stall. Whether that is a benefit or a hazard depends entirely on your control scheme, so it is worth settling early, not at the design review.
- Where a conventional pump is the better answer
- Above the top of the range, a well-specified sealed pump is the right choice, and we will say so on the first call.
Motor and drive
The hydraulics, the slotless BLDC motor, and the drive electronics are all our own design, developed from a clean sheet and built in our own building. That matters for two practical reasons.
First, an operating point can be moved to suit your loop. You are not designing around a catalog part. Rewinding to a different turn count or revising a housing is a conversation with the people down the hall.
Second, you specify one assembly with one part number. No integrating a pump, a drive, and a controller from three suppliers, and no owning the interfaces between them. Fewer cables, smaller footprint, faster commissioning, and one party responsible when something misbehaves.
The motor is not a new idea for us. More than 16,000 motors on the same slotless design and technology have shipped, with zero motor defects. The seal-less hydraulics wrapped around it are the new part.

- Motor
Slotless BLDC, in-house design and winding
A slotless BLDC motor has no iron teeth between the windings and the magnets. That removes cogging torque, which is the reason a conventional brushless motor pulses slightly as it turns, and it changes the acoustic signature. It also means the winding is designed rather than wound into a fixed slot geometry.
- Power range
0.10 to 5.0 kW
The span of shaft power the line covers. Useful for ruling a line in or out, not for choosing within it.
- Bus voltage
12 to 800 V DC
The DC supply the drive electronics accept. Data center in-rack distribution has been 54 V DC, and is moving to 800 V DC to keep current manageable as rack power rises. A pump that spans both means the hydraulics survive that transition without qualifying a second supplier.
- Drive assemblies
- AC and DC configurations
- Speed control
Variable speed, modulates to load
Variable speed means the pump follows the thermal load instead of running flat out and being throttled. Since pump power scales roughly with the cube of speed, modest speed reduction produces a large power saving across a realistic duty profile.
- Dry running
Tolerated
Operating with no fluid in the wet end. It happens in practice when a loop is commissioned before it is filled, or when a pump loses prime in service. Many seal-less designs cannot survive it, because the fluid is doing the bearing lubrication or cooling.
- Patent status
Seal-less hydraulics and slotless motor, patent pending
Patent pending means an application has been filed and is under examination. It confers no enforceable rights until a patent is granted, but it does establish a priority date, which is what determines who was first to the invention.
Technical questions
The questions engineers ask first
If yours is not here, send it to info@aviemoretech.com.
The architecture
- What is a seal-less pump?
- In a conventional centrifugal pump the motor shaft passes through the wall of the wet end, and a mechanical or lip seal rides against that shaft to hold pressure. A seal-less pump has no shaft crossing that boundary at all. Torque is transmitted through a solid containment barrier, so there is no rotating seal face and no path for fluid to escape along a shaft.
- How is this different from a canned motor pump?
- Both get called seal-less and they are not the same thing. In a wet rotor or canned design the motor rotor magnetics sit in the process fluid, often integrated with the impeller, and the fluid does the cooling and bearing duty. In a magnetic drive the motor is a dry, separate assembly and only the inner magnet carrier and impeller are wetted. Aviemore is a magnetic drive design: the motor sits completely on the dry side, separate from the wet pump. Our design offers longer life because there is no shaft and no face-to-face contact of ceramic end caps. The motor and electronics can be serviced without opening the loop, and our pumps are designed for various fluids without abrasive contamination.
- What happens if the coupling is overloaded?
- A magnetic coupling has a maximum transmissible torque. Beyond it the inner and outer assemblies slip out of synchronisation and the impeller stops following the motor. This is a decoupling event, not a stall, and whether that is a useful protective behavior or something your controls need to detect depends on your supervisory scheme. It is worth settling early in a design, and we will talk it through on a call. The unit can be reset without any damage and start operating again.
- Can it run dry?
- Yes. Dry running is tolerated, which is not true of every seal-less architecture and matters in two real situations: commissioning a loop before it is filled, and losing prime in service. Tell us the duration you need to survive and we will confirm it against your configuration.
- Does the barrier cost efficiency?
- Yes. Driving torque through a containment barrier produces losses, and the magnitude depends on barrier material and wall thickness. We quantify it for your operating point. The slotless motor and variable speed control more than offset it across a realistic duty profile, and we will show you the numbers for your loop instead of quoting a headline figure.
Selecting and specifying
- Why is there no performance curve on this site?
- Because there is no single curve to publish. Hydraulic performance moves with duty point, inlet and outlet configuration, fluid and glycol concentration, temperature, and available bus voltage. We generate the curve for your conditions and send it. If the platform cannot reach your duty point we say so.
- What do you need from me to size a pump?
- Flow and head or system pressure drop, port size and orientation, fluid and glycol concentration, supply and return temperature, available AC supply or DC bus voltage, the space and mounting available, your redundancy scheme, and the expected volume and program timing. A duty point and a fluid is enough to get a useful first answer.
- What fluids are compatible?
- Our pumps are designed for various fluids without abrasive contamination. Wetted materials determine the specifics. Water and propylene or ethylene glycol mixtures are the common cases in liquid cooling, and dielectric fluids for immersion are a separate conversation. Send the fluid and concentration and we will confirm against the wetted path.
- Will it work on an 800 V DC rack?
- The platform covers 12 to 800 V DC bus architectures as well as AC distribution, so the same hydraulics carry across from current in-rack distribution to an 800 VDC deployment without qualifying a second supplier.
- Do you supply redundant configurations?
- Yes. N+1, 2N, active-active load sharing, and hot-swap arrangements are all in scope, built to your CDU or facility specification.
Buying and supply
- Do you offer private label?
- Yes. Most CDU and rack builders do not want a catalog pump with somebody else’s name on it. Custom hydraulics, controls, telemetry, and form factor are all in scope, along with private label and long-term supply terms.
- What certifications and registrations apply?
- Assemblies are UL and Intertek certifiable on request. Windings are Class B insulation. CAGE and UEI registration for federal supply is pending. We are not ISO 9001 certified today; our quality system is built on ISO 9001 and we are positioned to certify it where a customer requires it. Tell us what approvals your program needs and we will tell you what already exists and what has to be run.
- Where are the pumps made?
- Radford, Virginia, in a 156,000 square foot facility we own. Motor winding, machining, assembly, and test all happen in that building. Country of origin is the United States.
- How quickly can a design change be turned around?
- Once a set of specifications has been officially established, the design cycle and prototypes can be produced in 14 to 16 weeks. That is possible because the hydraulics, the motor, and the drive electronics are all ours and all in one building.
- What are the lead times?
- Design and prototypes take 14 to 16 weeks once a set of specifications has been officially established. For sample and production timing, send us your volumes and program schedule.